Your position: World / Asia / Israel / Ramat Gan / City Gate Ramat Gan
Ramat Gan (start page)
Ramat Gan

City Gate Ramat Gan
 

[Enlarge] [Purchase]
As pink as it gets for the struggle against breast cancer - 2004-9-27 (307151)
(c) Lior Israel
 
[Enlarge] [Purchase]
Top of the tower, rising above treetops - 2004-9-27 (184477)
(c) Lior Israel
 
[Enlarge] [Purchase]
Erected into the sky - 2004-9-27 (276481)
(c) Lior Israel
 
[Enlarge]
Israel's tallest, as seen from Israel's 2nd tallest - 2004-9-27 (173571)
(c) Tommi Junger
 
[Enlarge] [Purchase]
Israel's tallest against a clear blue firmament - 2004-9-27 (219170)
(c) Lior Israel
 
[Enlarge] [Purchase]
As narrow as it gets - 2004-9-27 (230241)
(c) Lior Israel
 
Photo Compilation
Click here to see more files.
  You are using Emporis.com and all data marked with * and additional tools are accessible through content/tools offered by Emporis.

With Emporis Research you get a lot more content. Click here for more details.

 
Do you have an update for the content on this page?
[Write to Emporis.com] [How to enter information]

Identification
Official name City Gate Ramat Gan
Alternative names *
Emporis Building Number 104915
 
Location
Address *
Exact Latitude *
Exact Longitude *
Location Map (POI) *
Zone Diamond Exchange District
City Ramat Gan
State Tel Aviv District
Country Israel
 
Technical Data
Height (tip) *
Height (struct.) 244 m 801 ft
Height (roof) *
Height (top floor) *
Length (max) *
Width (max) *
Floors (OG) 68
Floors (UG) *
Construction start *
Construction end 2001
GFA *
Elevators *
Work places *
Parking places *
Units (rooms) *
Costs at completion *
 
Building in General
Type of construction skyscraper
Architectural style *
Status completed

Facts
- Click here to begin the timeline of Shimshon Tower- Ramat Gan's tallest building through history.]
- Click here to begin the timeline of Shalom Meir Tower-Israel's tallest building through history.]
- The building appeared in a TV advertisment for Israel Lottery on December 2002.
- The original plan for Israel's tallest tower called for a 199m tower, however, due to high demand for offices and apartments before construction had even begun, the building's height was increased.
- Holds the title of Highest Occupied Floor in Israel.
- First tower in Israel to exceed 50 floors.
- The second official name, Moshe Aviv Tower, is after the tower's developer and owner, the late Moshe Aviv, who had died unexpectedly during the tower's construction.
- The construction period was extremely short, achieving a sequence of five stories per month with only one shift of 40 workers.
- Rate of concrete placement per month was 3,000 m³ (105,930 ft³).
- On a typical floor there are 42 windows.
- The top 16 stories feature the largest panoramic windows in the tower.
- One of the platforms inside the core is extremely large and was the biggest platform ever made by PERI GmbH Formwork and Scaffolding (in coordination with their Israeli branch), at the time.
- Total weight of the tower is 160,000 tons.
- Total length of the water pipes inside the tower is 15 km. Cumulative length of the air-conditioning pipes is 40 km.
- At more than 6 meters a second, the tower's elevators are some of the fastest in the country.
- Cost of a residential square meter in the tower is US$3,000 on average before required tax.
- Maximum sway at the top of the tower during an earthquake is 40 cm in each direction.
- Most expensive single tower ever built in the country.
- Typical floor size within the tower is 1,440 m².
- There is an approved plan for a similar tower of the same height, called Elite Tower. It is planned to be built across Jabutinski Road, on the current lot of Elite Factory.
- Inspired by the famous Westendstraße 1 in Frankfurt.
- A swimming pool and fitness club are situated on the tower's carpark annex roof.
- Despite its central location and remarkable height, the top floors are not accessible to the public and do not include an observation floor or a restaurant.
- First-ever high-rise to mix office and residential usage in Israel.
- Though accessed from the same entrance hall, separated lobbies and elevators serve the office and residential sections.
- A synagogue on the 3rd floor serves the tower's residents, tenants, and others.
- Tallest tower in Israel, overtook Azrieli Center Circular Tower.
- City Gate Ramat Gan is Aviv and Ocif Companies' flagship project and their most ambitious endeavor to date.
- Tallest tower, by number of floors (68), in the Middle East and Europe, at completion.
- On Monday, September 27th, 2004, as part of the annual, global City in Pink lighting campaign for the breast cancer struggle, the building was lit completely in bright pink light. Other buildings in Israel to be lit in previous years, were Shalom Meir Tower in 2003, and Azrieli Center towers in 2002.
- Has the largest car park facility in Israel for a single tower, with 10 parking levels; some are underground, some are overground.
- The tower consists of 63,000 m² of office space, 17,000 m² of residential space and 1,200 m² of commercial space.
- There are 98 apartments in the tower, sited on the top 11 floors. The highest round floor is a 690 m² penthouse, which is one of the most expensive flats in the country.
- The rooftop of the cylinder part serves as a helipad, making it the third skyscraper in Israel (and the first outside Tel Aviv), with a rooftop helipad. The fourth is Matcal Tower.

Companies involved in this Building*
Architect: AMAV A. Niv - A. Schwartz Architects

Emporis Premium Companies: AESA Eurogondolas, S.L..

Other companies: Aviv Enterprise & Investments Ltd, Aviv Ocif Investments & Development Ltd, Aviv Enterprise & Investments Ltd, Aviv Ocif Investments & Development Ltd, Aviv Enterprise & Investments Ltd, Setter Achitects, Israel David, M.G. Acoustic Consultants Ltd., Electra Israel Ltd., Alimak Hek Group AB, Josef Gartner GmbH, PERI Formwork Engineering Ltd., Bar Meidan, Aviv Enterprise & Investments Ltd, Bank HaMizrahi Ltd..